Tevatron Collider Operations and Plans
Abstract
Description
Run II of the Tevatron Collider is reviewed, emphasizing operations through March 15, 2004. The Run II Luminosity Upgrade plans and luminosity projections through 2009 are discussed.
8 pages - including 4 figures and 1 photograph to be published in proceedings of XXXIXth Rencontre de Moriond conference on ElectroWeak Interactions and Unified Theories, La Thuile, Aosta Valley, Italy, March 21-28, 2004
8 pages - including 4 figures and 1 photograph to be published in proceedings of XXXIXth Rencontre de Moriond conference on ElectroWeak Interactions and Unified Theories, La Thuile, Aosta Valley, Italy, March 21-28, 2004